bottle blowing machine: What to Check Before Ordering
Release time:
2026-11-10
At Eceng Machine, we offer the bottle blowing machine for buyers who need a reliable product and clear supply. The product is listed on the page as K12 12 Cavity Bottle Moulding Machine. The product is the K12 12 Cavity Bottle Moulding Machine, a bottle blowing machine in the Eceng K Series fast bottle blowing range. This article covers the product features, the specifications, the applications and the ordering points that matter.
What the Product Offers
The page lists 12 cavities, a maximum volume of 200 ml to 2 L, an output of 24,000 to 26,000 BPH, a maximum bottle diameter of 100 mm and a maximum bottle height of 330 mm. The machine uses servo-driven stretching, an integrated computer control system, a human-machine interface and a PLC, with manual and fully automatic operating modes and safety self-locking devices.
Specifications and Options
Cavities: 12. Maximum volume: 200 ml-2 L. Output: 24,000-26,000 BPH. Neck: 24-30 mm. Maximum bottle diameter: 100 mm. Maximum bottle height: 330 mm. Heating: 64 lamps, 2.0 kW each, maximum heating power 128 kW. Total installed power: 140 kW. Machine size: 9.57 x 1.6 x 1.9 m. Weight: 11.6 tons. Air: working pressure 5-6 kg/cm2, blowing pressure 25-45 kg/cm2, high-pressure air consumption 24,000 L/min. Chilled water: 5-6 kg/cm2, 10 degrees Celsius, 12,000 kcal/hr, 220 L/min.
Applications and Selection
The page lists plastic water bottles, carbonated beverage bottles, juice bottles, oil bottles and daily packaging bottles as the main applications. Eceng also supplies K, Q, J, H, YCQ and YC series blowing machines, auxiliary machines and capping machines, so the buyer can match the K12 with the upstream and downstream equipment.
Select the bottle blowing machine against the actual working conditions, not only the product name. Provide the required size, capacity or performance, the environment and the interface with the surrounding system, and ask the supplier to confirm the model. A sample or a drawing review before the order reduces the risk of a mismatch.
Quality, Packing and Ordering
Confirm the inspection points, the material or performance certificate, the packing method and the carton or pallet details. For a project order, agree the quantity, the labeling, the delivery schedule and the shipping terms in writing. Keep the approved sample or drawing as the reference for the bulk run, and check the packing against the transport method.

What to Confirm Before Ordering
Before ordering, confirm the model, the size, the material, the finish, the quantity and the destination market. Ask for the drawing, the test or inspection record and the lead time, and state any special packing, labeling or documentation requirement. The final specification should be written into the order confirmation rather than left to the product name.
Eceng Machine presents this product as part of its range and provides the page information for the buyer. For a project or a distribution order, the product should be selected together with the surrounding equipment and the site conditions. Confirm the technical details with the supplier and keep the approved reference for the bulk order.
Documentation is part of the order. Ask for the model drawing, the inspection record and the certificate that applies to the destination market. If the project requires a specific standard, state it in the inquiry and confirm it on the order confirmation.
Packing and transport should be agreed before production. Confirm the inner pack, the outer carton or pallet, the marking and the loading method, and check whether the product needs protection against moisture, impact or movement during shipment.
For repeat orders, keep the approved sample, the drawing and the specification sheet on file. A stable reference makes it easier to compare a new batch and to avoid a silent change in material, size or finish.
Send the application details, the quantity and the destination with your inquiry, and confirm the specification, packing and delivery schedule before the order. A product that matches the application and the project documents will be easier to approve and easier to install.
这里是标题一h1占位文字
Hot information